It can be applied even in very cold weather during winter months.
It is a simpler and more flexible application than hot asphalt.
It provides the opportunity to produce and stock patches to meet all needs at once.
It provides great savings in terms of energy, labor and time.
It can remain in storage for a long time without serious loss of stability.
Packaged asphalt can be stored for a least of 6 months under suitable conditions.
It does not require the use of a separate primer during application.
It can be used easily on all kinds of asphalt and concrete surfaces.
It can be used as a wearing layer in areas with low traffic.
It has a simpler and more flexible application than hot asphalt.
It gives more successful results in low penetration bitumens.
After laying and compacting, the road is immediately opened to traffic.
Things to Consider for a Good Application
Technical support should be received from the supplier for the first production.
If there is mud and water accumulation in the existing pit, it is cleaned.
The fact that the pit is moist does not pose a problem for the application.
The produced asphalt is compacted after being distributed homogeneously in the pit.
After the produced asphalt is distributed homogeneously in the pit, it is compressed.
Compaction with a compactor or patch roller gives the ideal result.
In cold asphalt application, the air temperature should not be below -10°C.
Additive dosage rate varies depending on regional climate and bitumen penetration.
On average, 6 - 10 kg of additives are used in the production of 1 ton of cold asphalt.
The quality of the additive used in the usage rate is a very important variable.
If cold asphalt will be stored without packaging, the additive rate is increased.
Cold asphalt stored in open areas should not be contacted with snow and rain.
The ideal temperature range is 110-130°C for bitumen and 90-110°C for aggregate.
The amount of bitumen is approximately 4% of the aggregate in the mixer.
Low viscosity bitumens give the best results in cold asphalt production.
If a high viscosity bitumen is to be used, the additive rate should be increased.
After the aggregate is mixed homogeneously with the bitumen, the additive is added.
The additive should be added to the mixture in the mixer, not to the bitumen tank.
The total mixing time in the asphalt plant is 50 seconds on average.
The maximum aggregate size to be used in cold asphalt production is 9mm.
Aggregate size can be up to 12mm in necessary cases.
Note:This article, which we have prepared with the current knowledge and experience, is for informational purposes only and is not a guarantee or commitment. It only covers our products and does not set a precedent for competing products, and cannot be used for commercial purposes or without permission. You can contact our company for detailed information and technical support.