ABOUT COLD ASPHALT PRODUCTION

Advantages Of Using Cold Asphalt

  • It can be applied even in very cold weather in winter.
  • It is a simpler and more flexible application than hot asphalt.
  • It makes it possible to produce and stock enough asphalt to meet all needs at once.
  • Saves energy, labor and time.
  • Can stand for a long time in closed environments without significant loss of stability.
  • If the asphalt produced is packaged, it can be stocked for a minimum of 6 months.
  • It does not require the use of a primer during application.
  • It can be used easily on all asphalt and concrete surfaces.
  • It can also be used as a wear layer in low-traffic areas.
  • It has a simpler and more flexible application than hot asphalt.
  • It gives more successful results in low penetration bitumen.
  • Road can be opened to traffic immediately after compaction.


Considerations for a Good Practice

  • In the first application, technical support should be obtained from the supplier.
  • If there is mud and water in the existing pit, it is cleaned.
  • The dampness of the pit does not pose a problem in practice.
  • A sufficient amount of the prepared mixture is taken and poured into the pit.
  • After the produced asphalt is distributed homogeneously in the pit, it is compressed.
  • Compaction with a compactor or patch roller gives the ideal result.
  • The application temperature of cold asphalt in the field is maximum -10°C.
  • Additive dosage varies according to climate, bitumen type and aggregate size.
  • Depending on the climate, 8 -13 kg of additives are used in 1 ton of production.
  • Dosage of additives should be increased in productions that are stored in the open.
  • Unpackaged asphalt is stored in such a way that it is not affected by snow and rain.
  • The ideal manufacturing temperature is 130°C for bitumen and 110°C for aggregate.
  • The amount of bitumen in the mixture should be approximately 4% of the aggregate.
  • The most successful penetration type in cold asphalt production is 160 - 220.
  • Additive dosage increases in bitumen with high penetration.
  • After mixing the aggregate&filler homogeneously with the bitumen additive is added.
  • The additive should be added to the mixture in the mixer, not to the bitumen tank.
  • The total mixing time in the plant is 1 minute on average under normal conditions.
  • The maximum aggregate size to be used in production is 9mm and can be increased to 12mm in mandatory cases.
  • Gradations above this do not give the desired result.

Note: This article, which we have prepared with current knowledge and experience, is for informational purposes only and is not a guarantee or commitment. Covers only the product we sell. It does not constitute a precedent for equivalent products, cannot be used for commercial purposes or without permission. For more detailed information and technical support, please contact our company.

“KUZEYFALT CHEMICAL”